| Location |
Bid Number & Project
Name |
Pre-Bid
Conference |
Bid
Opening |
Specification |
Attachments & Amendments |
Mandatory
Bid Submittal Forms |
Bid
Tabulation |
| D7 Joplin, MO |
IFB9-080716 Fabric Storage Structure |
None |
Jul 16, 2008 @ 1:00 PM |
D7 Fabric Structure Joplin SPEC |
Plan Holders |
D7 Fabric Structure Joplin BID |
BID SUMMARY Joplin Fabric |
| D10 Charleston and Dexter, MO |
IFB9-080722 Fabric Storage Structure |
None |
Jul 22, 2008 @ 1:00 PM |
D10 Fabric Structure DexCha SPEC |
*Addendum 001 D10 Fabric
- D10 Fabric Plan Holders |
D10 Fabric Structure DexCha BID |
BID SUMMARY Charleston and Dexter |
| D5 Ashland, MO |
IFB 9-080731 Sewer |
Jul 23, 2008 @ 10:00 AM |
Jul 31, 2008 @ 1:00 PM |
D5 Sewer Ashland Spec |
-D5 Sewer Ashland Plans
-D5 Ashland Sewer Plan Holders |
D5 Sewer Ashland Bid |
BID SUMMARY Ashland Sewer |
| D5 Tipton, MO |
IFB9-080731B Fabric Storage Structure |
None |
Jul 31, 2008 @ 1:00 PM |
D5 Tipton Fabric Spec |
*Addendum 001 D5 Tipton Fabric
-D5 Tipton Plan Holders |
D5 Tipton Fabric |
BID SUMMARY Tipton Fabric |
D6 Chesterfield,
MO |
IFB9-080814 Traffic Management Center HVAC Upgrade |
Aug 6, 2008 @ 10:00 AM |
Bid Date Changed to Aug 19, 2008 @ 1:00 PM |
D6 TMC HVAC Spec |
*Addendum 001 D6 TMC
*
Addendum 001 D6 TMC Drawings A - D6 TMC HVAC DRAW
- D6 TMC HVAC Plan Holders |
D6 TMC HVAC Bid |
BID SUMMARY D6 HVAC Upgrade |
| D1 Northwest Area |
IFB9-080814M Time and Material Project and Service Call Commercial Mechanical Services Price Agreement |
None |
Aug 14, 2008 @ 1:00 PM |
D1 Mechanical IDC SPEC |
D1 Mechanical Plan Holders |
D1 Mechanical IDC BID |
D1 Mechanical IDC Bid Tab |
| D3 Hannibal, MO |
IFB 9-080819 Overhead Door Replacement |
None |
Bid Date Changed to Aug 22, 2008 @ 1:00 PM |
D3 OH Doors SPEC |
* Addendum 002 D3 OHDoors
*Addendum 001 D3 OHDoors
- D3 OH Doors Plan Holders |
D3 OH Doors BID |
|
| D4 Belton, MO |
IFB9-080819A Storage Building (Pole Barn) |
None |
Aug 19, 2008 @ 1:00 PM |
Belton Pole Barn Spec |
- Belton Pole Barn Plan Holders
- Belton Pole Barn DRAW |
Belton Pole Barn BID |
BID SUMMARY D4 Belton |
| D2 Various Location North Central Areas, MO |
IFB9-080819B Metal Siding Installation |
None |
Aug 19, 2008 @ 1:00 PM |
D2 Siding SPEC |
-D2 Siding Drawings
- D2 Siding Plan Holders |
D2 Siding BID |
BID SUMMARY D2 Metal Siding |
| D3 Various Locations Northeastern Missouri |
IFB9-080819C Concrete Apron Replacement |
None |
Aug 19, 2008 @ 1:00 PM |
D3 Apron SPEC |
- D3 Aprons DRAW
-D3 Concrete Aprons Plan Holders |
D3 Apron BID |
BID SUMMARY D3 Concrete Aprons |
| Statewide |
Consultant Request for Qualifications and Statements |
None |
Sept 11, 2008 @ 1:00 PM |
Consultant Request For Qualifications |
|
|
|
|
|
|
|
|
|
|
|
Contractors that download documents will not be on the official plan-holders list; therefore, it will be the contractors' sole responsibility to download future bid information and possible amendments. Or, contractors may contact MoDOT's contract administer listed in the above solicitation(s) for inclusion in the official plan-holders list.Details of the procurement of supplies, materials, equipment and professional or general services, except for those required for construction of Missouri's transportation infrastructure, are covered in the links on this web page. Staff at the Missouri Department of Transportation executes these procurement functions in accordance with applicable statutes, and maximizes competitive procurement and awards on all its contracts.GENERAL DISCLAIMER
The Vendor is advised that attachments and amendments may exist to this document which provide additional information and instruction for the Vendor's reference. It is the sole responsibility of the Vendor to ensure he/she is in possession of all required attachments and amendments. The Vendor shall not be relieved of any responsibility for performance under the contract due to the failure of the vendor to obtain copies of the attachments and/or amendments.
All vendors' responses MUST be submitted in a sealed, hard copy form prior to the closing date and time indicated. It shall be the vendor's responsibility to be sure they are in receipt of all amendments, if any are issued. All responses are subject to the terms and conditions set forth by the Missouri Highways and Transportation Commission and the Missouri Department of Transportation. The documents are provided in Acrobat Reader format. Free Acrobat Reader download 