Business with MoDOT Business with MoDOT contact, jobs,  news, sitemap
Our mission is to provide a world-class transportation experience that delights our customers and promotes a prosperous Missouri.

Project Bid Opening Info
Online Plans Room
Contact Us
Map Request
MoDOT Express Lane
MoDOT
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888 ASK MODOT
(1-888 275 6636)
Facilities Construction and Maintenance
 

Location

Bid Number & Project Name
Pre-Bid Conference
Bid Opening

Specification

  Attachments & Amendments
Mandatory Bid Submittal Forms
Bid Tabulation
D7 Joplin, MO IFB9-080716 Fabric Storage Structure None Jul 16, 2008 @ 1:00 PM D7 Fabric Structure Joplin SPEC Plan Holders D7 Fabric Structure Joplin BID BID SUMMARY Joplin Fabric
D10 Charleston and Dexter, MO IFB9-080722 Fabric Storage Structure None Jul 22, 2008 @ 1:00 PM D10 Fabric Structure DexCha SPEC

*Addendum 001 D10 Fabric

- D10 Fabric Plan Holders

D10 Fabric Structure DexCha BID BID SUMMARY Charleston and Dexter
D5 Ashland, MO IFB 9-080731 Sewer Jul 23, 2008 @ 10:00 AM Jul 31, 2008 @ 1:00 PM D5 Sewer Ashland Spec

-D5 Sewer Ashland Plans

-D5 Ashland Sewer Plan Holders

D5 Sewer Ashland Bid BID SUMMARY Ashland Sewer
D5 Tipton, MO IFB9-080731B Fabric Storage Structure None Jul 31, 2008 @ 1:00 PM D5 Tipton Fabric Spec

*Addendum 001 D5 Tipton Fabric

-D5 Tipton Plan Holders

D5 Tipton Fabric BID SUMMARY Tipton Fabric

D6 Chesterfield,

MO

IFB9-080814 Traffic Management Center HVAC Upgrade Aug 6, 2008 @ 10:00 AM Bid Date Changed to Aug 19, 2008 @ 1:00 PM D6 TMC HVAC Spec

*Addendum 001 D6 TMC

* Addendum 001 D6 TMC Drawings A

- D6 TMC HVAC DRAW

- D6 TMC HVAC Plan Holders

D6 TMC HVAC Bid BID SUMMARY D6 HVAC Upgrade
D1 Northwest Area IFB9-080814M Time and Material Project and Service Call Commercial Mechanical Services Price Agreement None Aug 14, 2008 @ 1:00 PM D1 Mechanical IDC SPEC D1 Mechanical Plan Holders D1 Mechanical IDC BID D1 Mechanical IDC Bid Tab
D3 Hannibal, MO IFB 9-080819 Overhead Door Replacement None Bid Date Changed to Aug 22, 2008 @ 1:00 PM D3 OH Doors SPEC

* Addendum 002 D3 OHDoors

*Addendum 001 D3 OHDoors

- D3 OH Doors Plan Holders

D3 OH Doors BID
D4 Belton, MO IFB9-080819A Storage Building (Pole Barn) None Aug 19, 2008 @ 1:00 PM Belton Pole Barn Spec

- Belton Pole Barn Plan Holders

- Belton Pole Barn DRAW

Belton Pole Barn BID BID SUMMARY D4 Belton
D2 Various Location North Central Areas, MO IFB9-080819B Metal Siding Installation None Aug 19, 2008 @ 1:00 PM D2 Siding SPEC

-D2 Siding Drawings

- D2 Siding Plan Holders

D2 Siding BID BID SUMMARY D2 Metal Siding
D3 Various Locations Northeastern Missouri IFB9-080819C Concrete Apron Replacement None Aug 19, 2008 @ 1:00 PM D3 Apron SPEC

- D3 Aprons DRAW

-D3 Concrete Aprons Plan Holders

D3 Apron BID BID SUMMARY D3 Concrete Aprons
Statewide Consultant Request for Qualifications and Statements None Sept 11, 2008 @ 1:00 PM Consultant Request For Qualifications

Contractors that download documents will not be on the official plan-holders list; therefore, it will be the contractors' sole responsibility to download future bid information and possible amendments.  Or, contractors may contact MoDOT's contract administer listed in the above solicitation(s) for inclusion in the official plan-holders list.Details of the procurement of supplies, materials, equipment and professional or general services, except for those required for construction of Missouri's transportation infrastructure, are covered in the links on this web page. Staff at the Missouri Department of Transportation executes these procurement functions in accordance with applicable statutes, and maximizes competitive procurement and awards on all its contracts.GENERAL DISCLAIMER
The Vendor is advised that attachments and amendments may exist to this document which provide additional information and instruction for the Vendor's reference. It is the sole responsibility of the Vendor to ensure he/she is in possession of all required attachments and amendments. The Vendor shall not be relieved of any responsibility for performance under the contract due to the failure of the vendor to obtain copies of the attachments and/or amendments.

All vendors' responses MUST be submitted in a sealed, hard copy form prior to the closing date and time indicated. It shall be the vendor's responsibility to be sure they are in receipt of all amendments, if any are issued. All responses are subject to the terms and conditions set forth by the Missouri Highways and Transportation Commission and the Missouri Department of Transportation.
The documents are provided in Acrobat Reader format. Free Acrobat Reader download PDF Icon

   
 
CONTACT CAREERS NEWS SITEMAP CONTACT CAREERS NEWS SITEMAP