Local Programs

Local Programs provides federal funding to cities and counties for their transportation improvements.  Please reference the Local Public Agency Manual for a guide to utilizing federal funding made available to local agencies through the programs listed below. Click here for breakdown of manual sections.

Transportation Enhancements (TE)    

This program provides funding through a competitive selection process for transportation related activities other than routine highway and bridge construction.  For program details and project examples, click on your area below to access the TE Guide.  If you have comments, concerns or questions, please contact Terry Cox via phone at (573) 526-0531, fax at (573) 526-2819 or e-mail at terry.cox@modot.mo.gov.

State Map

Off-System Bridge Replacement and Rehabilitation (BRO)

This program provides funding to counties for replacement or rehabilitation of deficient bridges.

On-System Bridge Replacement and Rehabilitation (BRM)

This program provides funding through a competitive selection process for replacement or rehabilitation of deficient bridges.  

Congestion Mitigation and Air Quality (CMAQ)

This program provides funding for projects that improve air quality within Environmental Protection Agency designated areas.

Surface Transportation Program (STP)

Large Urban

This program provides funding for transportation facilities within the Transportation Management Areas of Kansas City, Springfield and St. Louis.

Small Urban

This program provides funding for transportation facilities within urban areas with an urban cluster population greater than 5,000.

Northwest North Central Northeast Kansas City Area Central St. Louis Area Southeast South Central Springfield Area Southwest
 

See below for Proposed changes to the LPA Manual which will be posted to this website until

October 31, 2008. 

  Local Public Agency Manual
 
Section 1 General and Administrative
Section 2 Bridge Soft Match Credit Program
Section 3 Project Selection and Programming
Section 4 Environmental and Cultural Requirements
Section 5 Agreements
Section 6 Consultant Contracts
Section 7 Right of Way and Public Hearings
Section 8 Preliminary Design
Section 9 Final Design
Section 10 Construction Authorization and Letting
Section 11 Construction
Section 12 Reimbursement and Auditing
Section 13 Glossary of Terms
Section 14 Addresses
 

Fig. 1-1-1

Project Flowchart for Local Federal-Aid Projects
Fig. 1-1-2 LPA Planning Process
Fig. 1-1-3 MoDOT Programming Process
Fig. 1-1-4 Right of Way Process
Fig. 1-1-5 Preliminary Plan Process
Fig. 1-1-6 Plans Specifications & Estimate Process
Fig. 1-1-7 Letting Plans & Contract Proposal Process
Fig. 1-1-8 Construction Bidding and Contract Process
Fig. 1-1-9 LPA-MoDOT Agreement Process
Fig. 1-1-10 Engineering Services Contract Process
Fig. 3-1-1 Programming Data Form
Fig. 3-1A Programming Data for Non-Infrastructure
Fig. 3-2 Utilities Scoping Checklist
Fig. 4-1 Categorical Exclusion Determination
Fig. 4-1-A Instructions for Preparing Categorical Exclusion Determination
Fig. 4-2 Farmland Conversion Impact Rating
Fig. 4-3 Section 106 Project Information Form
Fig. 4-4 Section 106 Flowchart of Typical Procedures
Fig. 4-5 Memorandum of Agreement
Fig. 4-6 Application for Department of the Army Permit
Fig. 4-7 Nationwide 404 Permit for Minor Road Crossings
Fig. 4-8 Air Quality Sample Statement
Fig. 4-9 Section 4(f) Compliance worksheet
Fig. 5-1 Safe Routes to School Program Agreement
Fig. 5-2 STP-Urban Program Agreement
Fig. 5-3 Transportation Enhancement Funds Program Agreement
Fig. 5-4 Off-System Bridge Replacement and Rehabilitation Program Agreement
Fig. 5-5 On-System Bridge Replacement and Rehabilitation Program
Fig. 5-6 Congestion Mitigation and Air Quality Agreement
Fig. 5-7 Transportation and Community and System Preservation Program Agreement
Fig. 5-8 Federal Aid Program Agreement
Fig. 5-9 Congestion Mitigation and Air Quality Agreement (Vehicle and Equipment Purchases)
Fig. 5-10 Sample Ordinance
Fig. 6-1 Contract
Fig. 6-2 Consultant Selection Criteria
Fig. 6-3 Missouri Revised Statutes
Fig. 6-4 Supplemental Agreement to Engineering Services Contract
Fig. 6-5 Consultant Performance Appraisal Form
Fig. 6-6 Common Unallowable Costs
Fig. 7-1 Example Notice of Public Hearing
Fig. 8-1 Dimensional Accuracy
Fig. 8-2 Engineering "No Rise" Certificate
Fig. 8-3 FEMA National Flood Insurance Program Requirements
Fig. 9-1 Work by Local Forces Proposal
Fig. 9-2 Utility Depth and Encasement Requirements
Fig. 10-1 Checklist for Bid Proposal
Fig. 10-2 Guidelines for Obtaining Environmental Clearance
Fig. 10-3 Sample Advertisement
Fig. 10-4 Anti-Collusion Statement
Fig. 10-5 Subcontractor Certification Regarding Affirmative Action
Fig. 11-1 General Guidelines for Preconstruction Conference
Fig. 11-2 Change Order Form
Fig. 11-3 Progress Report
Fig. 11-4-1 Request for Approval of Subcontract
Fig.11-4-2 DBE Subcontract Worksheet
Fig. 11-4-3 Contractor's Instruction for Filling Out Request To Subcontract Work
Fig. 11-5 Wage Rate Interview
Fig. 11-6 Form FHWA-1391
Fig. 11-7 Contractor Certification
Fig. 11-8 Contractor's Affidavit Regarding Settlement of Claims
Fig. 11-9 Affidavit (Compliance with the Prevailing Wage Law)
Fig. 11-10 Guide Schedule for Federal-Aid Acceptance Sampling
Fig. 12-1 Sample Form for Submitting Invoices
   
 

Proposed changes to the LPA Manual will be posted to this website until October 31, 2008. 

 

The LPA Manual Review Team discussed all of the proposed changes that were submitted throughout the past year.  Some of those proposed changes will affect how you may have done business in the past, and are listed below.

Section 1-4 The Project Development/Implementation Schedule shown on Page 1-4 has the word "agreement" added to Project Programming.
Section 3 - Figure 3-1-1 Addition of "stream crossing" was made to the Location block on the Programming Data Sheet.
Section 6-1 "inspection process" was added to sentence referring to the sponsor submitting an estimate of anticipated activities that will take place during the design process.
Section 6-3 New language regarding conflict of interest was added to the Selection Procedures section.
Section 6-6 New language regarding supplemental agreements.
Section 6-7 New language referring to original engineering services contracts was added to the Supplemental Agreements section.
Section 10-1 "Letting date" was changed to "bid opening date" under the Wage Rate section.
Section 10-6 New language regarding FHWA guidelines to Internet advertising was added.
 

Section 4 (Environmental Requirements) was heavily revised to reflect changed/new requirements, address incomplete or missing information, correct inaccuracies, incorporate relevant material that was previously located in other chapters, and improve its usefulness to aid the LPAs in complying with environmental regulations.  The FHWA initially suggested the section be reviewed/updated and subsequently commented on the revised version.  Material/figures moved from other chapters, such as floodplain requirements and discussion of channel modifications, were replaced with brief summaries and cross-references to Section 4 in the original locations. 

All of the Sections have been revised to correct grammar errors.  Website links throughout the manual were checked and revised where necessary.

If you have any comments, please respond before October 31, 2008 by using the Revisions Comment Form that is available below.  These changes, if accepted, will be effective on January 1, 2009, and the website will be updated at that time.  

Proposed changes to the Sections and the Figures affected are listed below:

 
Section 1 General
Section 2 Bridge Soft Match Credit Program
Section 3 Project Selection and Programming
Section 4 Environmental Requirements
Section 5 Agreements
Section 6 Consultant Contracts
Section 7 Right of Way and Public Hearings
Section 8 Preliminary Design
Section 9 Final Design
Section 10 Construction Authorization and Letting
Section 11 Construction
Section 12 Reimbursement and Auditing
Section 13 Glossary of Terms
Section 14 Addresses
Figure 3-1-1 Programming Data
Figure 4-1-A Instructions for Preparing Categorical Exclusion Determination
Figure 4-3 Floodplain Development Permit
Figure 4-8 Bridge Inventory Form (New)
Figure 4-9 Section 106 Procedures
Figure 4-10 Memorandum of Agreement
Figure 4-11 Borrow Guidelines
Figure 10-1 Checklist for Bid Proposal
   
  Printable Version ( 303 pages, pdf 72 mb)
   
  To request a hard copy or CD copy of the manual, contact the Missouri Department of Transportation, Attention:  Marie Hunolt, P.O. Box 270, Jefferson City, MO 65102, by e-mail at marie.hunolt@modot.mo.gov or by calling (573) 526-5859.
   
  Please use the LPA Manual Change Request Form to request manual changes throughout the year or the Revisions Comments Form to make comments on the proposed revisions posted every October.
   
  Other Helpful Information
  Safe Routes To School (SRTS)
  Scenic Byways                   
  Reasonable Progress Policy
  Local Public Agency Land Acquisition Manual
  Frequently Asked Questions New button
  ADT on MoDOT Routes
   
   
 

Commonly Used Forms

  Figure 3-1    Programming Data Form
  Figures 3-1A  Programming Data For Non-Infrastructure
 

Figure 4-1    Categorical Exclusion

  Figure 5-10  Sample Ordinance
  Figure 6-1    Engineering Services Contract
  Figure 8-2   Engineering "No-Rise" Certificate
  Figure 8-3   FEMA Investigation Certification
 

Figure 10-5  Subcontractor Certification Regarding Affirmative Action

  Figure 12-1  Sample Form for Submitting Invoices
  SI & A Form
  Bridge Inventory Survey Form
  DBE Submittal Forms
  Disadvantaged Business Enterprise Contract Provisions
  FHWA Form 1273  Required Contract Provisions
  Utility Agreement - Actual Cost
  Utility Agreement - Lump Sum
  Notice to Proceed
  Daily Force Account Record-Equipment Rental Account/Materials Account
  Daily Force Account Record-Labor Account
  Force Account Record - Cost Summary
  Sample Timesheet
   
 

Examples of Completed Forms

  Form CE-2 Example
  Utility Lump Sum Estimate Example
  Utility Actual Cost Estimate Example
  Sample Utilities Status Letter
  Sample Job Special Provisions for Utilities
  Sample Utility Agreement - Lump Sum
  Sample Utility Agreement - Actual Cost
  Bridge Slab Pour Checklist & Pre-Pour Meeting Topics
   
 

Links to Other Resources

  Alternate Paving
  Engineering Policy Guide
  Equal Employment Opportunity Requirements
  Federal Highway Administration
  Code of Federal Regulations 23 Highways
  Program Guide - Utility Adjustments and Accommodations on Federal-Aid Highway Projects
  US Army Corps of Engineers
  Americans with Disabilities Act Accessibility Guidelines
  Missouri Standard Specifications for Highway Construction
  Federal Wage Rates
  Required Federal Aid Provisions
  MoDOT's General Pedestrian and Bicycle Guide
  State Wage Rates - Annual Wage Order for Local Agency Projects
  State Wage Rates - General Wage Order for MoDot Projects
  National Transportation Enhancement Clearinghouse
 

Missouri LTAP, Local Technical Assistance Program

  The documents are provided in Acrobat Reader format. Free Acrobat Reader download PDF Icon
 
   
 
CONTACT CAREERS NEWS SITEMAP CONTACT CAREERS NEWS SITEMAP